Sludge


Release Time:

Nov 11,2024

 

Process introduction:

This process is primarily designed for sludge pumping. The entire system features a light steel factory building, a sludge storage bin equipped with a hydraulic arch-breaking device and an electrically driven dual single-shaft unloading screw device, DTPP series solid pump, hydraulic stations, electrical control cabinets, and conveyor pipelines. Trucks unload the sludge into a flat-bottom storage bin in the pit, with a storage capacity of 60–200 m³ (customizable based on customer requirements). The hydraulic arch-breaking device, which is placed on the bottom of the bin, pushes the sludge to the flange opening of the single-shaft screw unloading device. The single-shaft screw then feeds the sludge into the pump, which uses a piston reciprocating motion to pump the sludge to the designated location.

Advantages of the solution:

The system operates under high pressure (up to 80 bar) and offers high throughput, with a material specific gravity ≥ 1.2. It is capable of long-distance transport.

Through alternating cycle feeding, the DTPP series solid pump enables continuous material delivery.

It features excellent sealing performance, ensuring minimal leakage.

During the transport process, the piston head is washed and cooled to extend its service life.

All critical operating parameters (pressure, speed etc.) are displayed and tracked in real-time, enhancing operational flexibility and allowing for better integration of the equipment into the overall process system.

The equipment is designed with a modular structure, allowing for quick replacement of wear parts and critical components, especially the piston head and cutting components. Wear parts and key components can be replaced individually.

What Else Might You Learn?

SIDSA focuses on technological research and innovation in the field of waste pretreatment

Feb 04,2026

SIDSA Shines at CemFuels Asia | Solving Alternative Fuel Challenges with Tailored Mature Solutions

The inaugural CemFuels Asia was grandly launched in Bangkok, Thailand, attracting over 200 industry experts from 25 countries worldwide. As a critical milestone for the Asian cement industry’s journey toward “carbon neutrality,” we were invited to participate and engaged with industry peers to discuss how advanced pre‑treatment technology can address the supply‑chain bottlenecks of alternative fuels and unlock the energy potential of waste.

Jan 27,2026

SIDSA Participates in the World Economic Forum (WEF) Annual Meeting in Davos

The World Economic Forum (WEF) Annual Meeting in Davos is regarded as one of the most influential global conferences. Each year, it brings together governments, international organizations, and key industry leaders to discuss critical issues such as energy, environment, and sustainable development. This year’s meeting was held in Davos, Switzerland.

Product

SIDSA focuses on technological research and innovation in the field of waste pretreatment