SMP— Hazardous Waste

Shredding.Mixing.Pumping.

Release Time:

Dec 18,2024

 

Process Introduction:

SID IS SPECIALIZED IN THE FIELD OF DESIGN, DEVELOPMENT AND CONSTRUCTION OF TURNKEY SMP INSTALLATIONS FOR HAZARDOUS WASTE.

SID is the market leader in constructions of kiln feeding systems for hazardous waste and for substitute fuels in the cement industry.

The plants are designed depending on the types of applied waste in consideration of the highest safety standards and equipped with interlocking chambers and oxygen control systems in the hazardous waste area.

The SMP technology represents a highly attractive investment for the hazardous waste area as well as for the cement industry.

The SMP system is designed for an optimized technical and commercial service:

Hazardous waste is given into the system and treated accordingly. The final, homogenised product can be used as substitute fuel (= reduction of primary fuel costs) e.g. in the cement industry.

Advantages of the solution:

- Reduction of primary energy costs by utilisation of alternative fuels

- Increased safety at work due to automated operation.

- The SMP can be operated by a single person.

- Higher throughout (up to 20%)

- Higher lifetime of the key components (e.g. +20% for the cladding)

- Reduction of additives in flue gas treatment system

- Increase of installation availability due to reduced kiln maintenance operations

What Else Might You Learn?

SIDSA focuses on technological research and innovation in the field of waste pretreatment

Oct 11,2025

SID Showcases Waste to Energy Systems at WETEX 2025 in Dubai

SIDSA recently participated in WETEX 2025, joining environmental and energy enterprises from around the globe. At the exhibition, SIDSA presented solid waste resource utilization solutions, including the SMP System and RDF Production System, addressing the growing demand for the recovery of solid waste, hazardous waste, and municipal solid waste in the Middle East.

Oct 23,2025

World's First! SIDSA Shredding Technology Powers Biomass Energy Project.

In Anhui Province, a landmark project has set a new global standard: the world's first integrated facility producing liquefied biomethane (Bio-LNG) with carbon capture, utilization, and storage (CCUS) from organic waste. This initiative represents not just a breakthrough in energy technology but a tangible model for the circular economy in action.

Sep 25,2025

A Whale of a Solution: XLC 7300A Processes 250 TPH in Overseas MSW Operation

SIDSA XLC 7300 Primary Shredder Successfully Commissioned for Overseas Client, Setting New Benchmark in International Waste Processing

Product

SIDSA focuses on technological research and innovation in the field of waste pretreatment